Research on effectiveness evaluation method and application of quality management system of manufacturing enterprise based on interval-valued hesitation fuzzy set

Yu Chen Yao

Business School of Hohai University, Nanjing, P. R. China

E-mail: 326603581@qq.com

Received 3 August 2017; accepted 14 August 2017

DOI https://doi.org/10.21595/vp.2017.18937

 

Abstract. Based on acquaintance of effectiveness of quality management system of manufacturing enterprise, the evaluation index system is structured by confirmation of production conditions and other seven respects which include effectiveness of validation, effectiveness of document management, effectiveness of production management, effectiveness of quality assurance and quality control, effectiveness of commissioned production and inspection, effectiveness of Issue and recall of products and effectiveness of self-checking; the assessment model of effectiveness of quality management system of manufacturing enterprise based on interval-valued hesitation fuzzy set is structured and the feasibility of theoretical research was validated by concrete cases.

Keywords: effectiveness of quality management system, evaluation methods, interval-valued hesitation fuzzy set.

References

[1]        Frems D., Janssns M., Madhok A., et al. Toward an integrative perspective on alliance governance: connecting contract design, trust dynamics and contract application. Academy of Management Journal, Vol. 51, Issue 6, 2008, p. 1053‑1078.

[2]        Dyer J. H., Chu W. The role of trustworthiness in reducing transaction costs and improving performance: empirical evidence from the United States, Japan and Korea. Organization Science, Vol. 14, Issue 1, 2003, p. 57‑68.

[3]        Hwang Bon Gang, Zhao Xianbo, Gay Mindy Jiang Shu Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors. International Journal of Project Management, Vol. 31, Issue 3, 2013, p. 424‑433.

[4]        Sodeikat Christian, Dauber Schmidt Christoph Corrosion monitoring of RC-structures for public private partnership projects. Making durability visible. Beton und Stahlbetonbau, Vol. 101, Issue 12, 2006, p. 932‑942.

[5]        Yuan Jingfeng, Zeng Alex Yajun, Skibniewski Miroslaw J., Li Qiming Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, Vol. 27, Issue 3, 2009, p. 253‑270.

[6]        Augustínová Edita, Daubner Michal Performance measurement and management of public-private partnership projects. International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, Vol. 2, Issue 3, 2013, p. 239‑246.

[7]        Ng Angie, Loosemore Martin Risk allocation in public private partnership (PPP) projects: the new southern railway project. Proceedings of 22nd Annual Association of Researchers in Construction Management Conference, Vol. 2, 2006, p. 573‑580.

Cite this article

Yao Yu Chen Research on effectiveness evaluation method and application of quality management system of manufacturing enterprise based on interval‑valued hesitation fuzzy set. Vibroengineering PROCEDIA, Vol. 14, 2017, p. 294‑299.

 

JVE International Ltd. Vibroengineering PROCEDIA. Oct 2017, Vol. 14. ISSN 2345-0533